TikT0k: @cook.circle   Home | Privasi | About Angga Purwana

Profil Singkat Radityo Talogo

Radityo Talogo

koneksi tingkat ke-3
Project Manager at Elsewedy Electric Indonesia
Jawa Barat, Indonesia

Tentang

Project Manager at Elsewedy Electric Indonesia formally known as CG Power Systems Indonesia

Difiturkan

Aktivitas

342 pengikut

  • Radityo Talogo mengomentari sebuah posting • 1bln1bln
    Nanda Novadina Cynthia
  • Radityo Talogo mengomentari sebuah posting • 2bln2bln
    Nanda Novadina Cynthia

Pengalaman

  • Project Manager
    Elsewedy Electric Indonesia · Purnawaktu Jul 2021 - Saat ini · 1 thn 7 bln Jakarta, Indonesia
  • PT.CG Power Systems IndonesiaPT.CG Power Systems Indonesia Purnawaktu 7 thn 10 blnPurnawaktu 7 thn 10 bln
    • Project Engineer/ Project ManagerProject Engineer/ Project Manager Nov 2018 - Jul 2021 · 2 thn 9 blnNov 2018 - Jul 2021 · 2 thn 9 bln Greater Jakarta Area, IndonesiaGreater Jakarta Area, Indonesia
        • PLN Project: 1. No. 0044/DAN.02.02/UIP JBT II/2019 Uprating 2 Line Bay GI 150kV Pedan Arah Wonosari Dan GI 150kV Wonosari Arah Pedan - 150kV Pedan Substation - 150kV Wonosari Substation 2. No. 0385-3.PJ/DAN.02.02/DIR/2018 Pekerjaan Desain, Supply dan Instalasi Transformator Bay 150kV Dan 70kV Extension di Sumatera, Kalimantan dan Sulawesi LOT 3 : Regional Sulawesi -150kV Poso Substation -70kV Talise Substation -150kV Kendari Substation Responsible: - Maintain Progress Project base on Schedule and S-Curve - Maintain Procurement and Purchasing for Create PO and Delivery item base on schedule - Follow up Daily Progress every Switchyard - Follow up E/M and Civil Drawing Completeness & PLN Approval - Follow and support Design Review Meeting with PLN - Follow up LKP Completeness for Invoice - Testing And Commissioning - Maintain traveling cost and site expenses
    • Industrial EngineerIndustrial Engineer Okt 2013 - Nov 2018 · 5 thn 2 blnOkt 2013 - Nov 2018 · 5 thn 2 bln Kawasan Industri Menara Permai Kav. 10, Jl. Raya Narogong, Cileungsi, Bogor, JawKawasan Industri Menara Permai Kav. 10, Jl. Raya Narogong, Cileungsi, Bogor, Jaw
        • 1.Design tools, to help manufacture process 2.Calculate Strength of material (Manual & Compare by Cosmos work) 3.Building Renovation
        • Star of the monthStar of the month Star of the month awardStar of the month award
    • Design EngineerDesign Engineer Okt 2013 - Jan 2014 · 4 blnOkt 2013 - Jan 2014 · 4 bln West Java Province, IndonesiaWest Java Province, Indonesia
  • Tool Designer
    Sarana Wira Reksa Mar 2012 - Jan 2013 · 11 bln JL. Pulo Gadung 1, SSB Blok 1/3, Kawasan Industri Pulo Gadung, Jakarta Timur, 13
      • Design Press tool, Jig & Fixture, Checking Fixture Project: - Press tool Design for PT.Komponen Futaba Nusapersada (Flange Exhaust) - Checking Fixture for Product

Pendidikan

  • Universitas TerbukaUniversitas Terbuka Bachelor's degree, Marketing/Marketing Management, GeneralBachelor's degree, Marketing/Marketing Management, General 2019 - 20222019 - 2022
  • Politeknik Manufaktur Negeri Bandung (PMS-ITB)Politeknik Manufaktur Negeri Bandung (PMS-ITB) Diploma 3, Tool designDiploma 3, Tool design 2010 - 20132010 - 2013
      • learn about manufacturing process, technical drawing 1.Press Tool Design : - Press tool Design - Molding Design - Jig and Fixture 2.General Mechanic Design 3.Mechanical Technic 4.Project Management

Lisensi dan sertifikasi

  • Export Procedure Training
    Ministry of Trade of the Republic of Indonesia Diterbitkan Jul 2022 Tidak Ada Tanggal Kedaluwarsa ID Kredensial 1449/SJ-DAG.12/PE/7/2022
  • Project Management Professional (PMP)
    Dcolearning Diterbitkan Des 2019 Tidak Ada Tanggal Kedaluwarsa
  • Operation and safety training JLG Scissor Lift 6RS
    NATRACO - Aerial Work Platform Division Diterbitkan Feb 2016 Tidak Ada Tanggal Kedaluwarsa

Keahlian

  • SolidWorksSolidWorks
    • 3 rekomendasi keahlian3 rekomendasi keahlian
  • AutoCADAutoCAD
    • 2 rekomendasi keahlian2 rekomendasi keahlian
  • solidworks simulationsolidworks simulation
    • 2 rekomendasi keahlian2 rekomendasi keahlian

Kursus

  • AutoCAD 2D
  • AutoCAD 3D
  • Microsoft Project

Proyek

  • Uprating 2 line bay GI 150kV Pedan arah Wonosari, GI150kV Wonosari arah Pedan
    Jul 2019 - Sekarang
      • As Project Manager Responsible: - Maintain Progress Project base on Schedule and S-Curve - Maintain Procurement and Purchasing for Create PO and Delivery item base on schedule - Follow up Daily Progress every GI - Follow up E/M and Civil Drawing Completeness & PLN Approval - Follow and support Design Review Meeting with PLN - Follow up LKP Completeness for Invoice Civil work (Tansformer Foundation, Foundation HV Apparatus, Control Building) 1.GI 150kV Pedan 2.GI 150kV Wonosari
  • APLN Project Lot.3, Sulawesi Region
    Nov 2018 - Des 2021
      • As Project Manager Responsible: - Maintain Progress Project base on Schedule and S-Curve - Maintain Procurement and Purchasing for Create PO and Delivery item base on schedule - Follow up Daily Progress every GI - Follow up E/M and Civil Drawing Completeness & PLN Approval - Follow and support Design Review Meeting with PLN - Follow up LKP Completeness for Invoice Civil work (Tansformer Foundation, Foundation HV Apparatus, Control Building) 1.GI Poso 150kV (Energize 10 January 2020) 2.GI Talise 150kV (Energize 9 January 2020) 3.GI Kendari 150kV (Energize 22 January 2020)
  • Closing Pending Item IBRD Project
    Sep 2019 - Agu 2020
      • Project No: 8280 Closing Pending item and complete Responsible Area: PLN UIP Jawa Bagian Barat -Serang Substation -Penggilingan Substation PLN UIP Jawa Bagian Timur dan Bali -Surabaya Selatan -New Kediri -Almaura -Nusa Dua PLN UIP Sulawesi Bagian Selatan -Tanjung Bunga -Bontoala -Panakukang -Sungguminasa

Gelar Kehormatan dan Penghargaan

  • Star Of the month
    Dikeluarkan oleh PT.CG Power System Indonesia · Jan 2016
  • Top 3 best Project Continues Improvement Project (Reduce Lead Time Metal Part Handling)
    Dikeluarkan oleh PT.CG Power System Indonesia · Jan 2016
      • Base on Weekly Scoring & Implementation, my CIT Project (Reduce Frame Assembly Lead time), Nominated as CIT Winner (Forth position)
  • Top 5 Continues Improvement Project (Reduce Frame Assembly Lead time)
    Dikeluarkan oleh PT.CG Power System Indonesia · Apr 2015
      • Base on Weekly Scoring & Implementation, my CIT Project (Reduce Frame Assembly Lead time), Nominated as Top 5 Project

Bahasa

  • Bahasa Indonesia
  • English

Minat

  • AkzoNobelAkzoNobel 653.466 pengikut653.466 pengikut
  • Korn FerryKorn Ferry 1.216.643 pengikut1.216.643 pengikut

Posting Komentar

Lebih baru Lebih lama