Radityo Talogo
koneksi tingkat ke-3
Project Manager at Elsewedy Electric Indonesia
Jawa Barat, Indonesia
Tentang
Project Manager at Elsewedy Electric Indonesia formally known as CG Power Systems Indonesia
Difiturkan
Aktivitas
340 pengikut
-
Radityo Talogo mengomentari sebuah posting • 1bln1blnNanda Novadina Cynthia
-
Radityo Talogo mengomentari sebuah posting • 2bln2blnNanda Novadina Cynthia
Pengalaman
-
Project ManagerElsewedy Electric Indonesia · Purnawaktu Jul 2021 - Saat ini · 1 thn 6 bln Jakarta, Indonesia
-
PT.CG Power Systems IndonesiaPT.CG Power Systems Indonesia Purnawaktu 7 thn 10 blnPurnawaktu 7 thn 10 bln
-
Project Engineer/ Project ManagerProject Engineer/ Project Manager Nov 2018 - Jul 2021 · 2 thn 9 blnNov 2018 - Jul 2021 · 2 thn 9 bln Greater Jakarta Area, IndonesiaGreater Jakarta Area, Indonesia
-
-
PLN Project: 1. No. 0044/DAN.02.02/UIP JBT II/2019 Uprating 2 Line Bay GI 150kV Pedan Arah Wonosari Dan GI 150kV Wonosari Arah Pedan - 150kV Pedan Substation - 150kV Wonosari Substation 2. No. 0385-3.PJ/DAN.02.02/DIR/2018 Pekerjaan Desain, Supply dan Instalasi Transformator Bay 150kV Dan 70kV Extension di Sumatera, Kalimantan dan Sulawesi LOT 3 : Regional Sulawesi -150kV Poso Substation -70kV Talise Substation -150kV Kendari Substation Responsible: - Maintain Progress Project base on Schedule and S-Curve - Maintain Procurement and Purchasing for Create PO and Delivery item base on schedule - Follow up Daily Progress every Switchyard - Follow up E/M and Civil Drawing Completeness & PLN Approval - Follow and support Design Review Meeting with PLN - Follow up LKP Completeness for Invoice - Testing And Commissioning - Maintain traveling cost and site expenses
-
-
-
Industrial EngineerIndustrial Engineer Okt 2013 - Nov 2018 · 5 thn 2 blnOkt 2013 - Nov 2018 · 5 thn 2 bln Kawasan Industri Menara Permai Kav. 10, Jl. Raya Narogong, Cileungsi, Bogor, JawKawasan Industri Menara Permai Kav. 10, Jl. Raya Narogong, Cileungsi, Bogor, Jaw
-
-
1.Design tools, to help manufacture process 2.Calculate Strength of material (Manual & Compare by Cosmos work) 3.Building Renovation
-
-
- Star of the monthStar of the month Star of the month awardStar of the month award
-
-
Design EngineerDesign Engineer Okt 2013 - Jan 2014 · 4 blnOkt 2013 - Jan 2014 · 4 bln West Java Province, IndonesiaWest Java Province, Indonesia
-
-
Tool DesignerSarana Wira Reksa Mar 2012 - Jan 2013 · 11 bln JL. Pulo Gadung 1, SSB Blok 1/3, Kawasan Industri Pulo Gadung, Jakarta Timur, 13
-
-
Design Press tool, Jig & Fixture, Checking Fixture Project: - Press tool Design for PT.Komponen Futaba Nusapersada (Flange Exhaust) - Checking Fixture for Product
-
-
Pendidikan
-
Universitas TerbukaUniversitas Terbuka Bachelor's degree, Marketing/Marketing Management, GeneralBachelor's degree, Marketing/Marketing Management, General 2019 - 20222019 - 2022
-
Politeknik Manufaktur Negeri Bandung (PMS-ITB)Politeknik Manufaktur Negeri Bandung (PMS-ITB) Diploma 3, Tool designDiploma 3, Tool design 2010 - 20132010 - 2013
-
Kegiatan dan masyarakat: basketball
-
-
learn about manufacturing process, technical drawing 1.Press Tool Design : - Press tool Design - Molding Design - Jig and Fixture 2.General Mechanic Design 3.Mechanical Technic 4.Project Management
-
-
-
-
Lisensi dan sertifikasi
-
Export Procedure TrainingMinistry of Trade of the Republic of Indonesia Diterbitkan Jul 2022 Tidak Ada Tanggal Kedaluwarsa ID Kredensial 1449/SJ-DAG.12/PE/7/2022
-
Project Management Professional (PMP)Dcolearning Diterbitkan Des 2019 Tidak Ada Tanggal Kedaluwarsa
-
Operation and safety training JLG Scissor Lift 6RSNATRACO - Aerial Work Platform Division Diterbitkan Feb 2016 Tidak Ada Tanggal Kedaluwarsa
Keahlian
-
SolidWorksSolidWorks
- 3 rekomendasi keahlian3 rekomendasi keahlian
-
AutoCADAutoCAD
- 2 rekomendasi keahlian2 rekomendasi keahlian
-
solidworks simulationsolidworks simulation
- 2 rekomendasi keahlian2 rekomendasi keahlian
Kursus
-
AutoCAD 2D
-
Terkait dengan Politeknik Manufaktur Negeri Bandung (PMS-ITB)
-
-
-
AutoCAD 3D
-
Terkait dengan Politeknik Manufaktur Negeri Bandung (PMS-ITB)
-
-
-
Microsoft Project
-
Terkait dengan CG Power and Industrial Solutions Limited (Formerly Crompton Greaves Limited)
-
-
Proyek
-
Uprating 2 line bay GI 150kV Pedan arah Wonosari, GI150kV Wonosari arah PedanJul 2019 - Sekarang
-
Terkait dengan Elsewedy Electric Indonesia
-
-
-
As Project Manager Responsible: - Maintain Progress Project base on Schedule and S-Curve - Maintain Procurement and Purchasing for Create PO and Delivery item base on schedule - Follow up Daily Progress every GI - Follow up E/M and Civil Drawing Completeness & PLN Approval - Follow and support Design Review Meeting with PLN - Follow up LKP Completeness for Invoice Civil work (Tansformer Foundation, Foundation HV Apparatus, Control Building) 1.GI 150kV Pedan 2.GI 150kV Wonosari
-
-
-
APLN Project Lot.3, Sulawesi RegionNov 2018 - Des 2021
-
Terkait dengan PT.CG Power Systems Indonesia
-
-
-
As Project Manager Responsible: - Maintain Progress Project base on Schedule and S-Curve - Maintain Procurement and Purchasing for Create PO and Delivery item base on schedule - Follow up Daily Progress every GI - Follow up E/M and Civil Drawing Completeness & PLN Approval - Follow and support Design Review Meeting with PLN - Follow up LKP Completeness for Invoice Civil work (Tansformer Foundation, Foundation HV Apparatus, Control Building) 1.GI Poso 150kV (Energize 10 January 2020) 2.GI Talise 150kV (Energize 9 January 2020) 3.GI Kendari 150kV (Energize 22 January 2020)
-
-
-
Closing Pending Item IBRD ProjectSep 2019 - Agu 2020
-
Terkait dengan PT.CG Power Systems Indonesia
-
-
-
Project No: 8280 Closing Pending item and complete Responsible Area: PLN UIP Jawa Bagian Barat -Serang Substation -Penggilingan Substation PLN UIP Jawa Bagian Timur dan Bali -Surabaya Selatan -New Kediri -Almaura -Nusa Dua PLN UIP Sulawesi Bagian Selatan -Tanjung Bunga -Bontoala -Panakukang -Sungguminasa
-
-
Gelar Kehormatan dan Penghargaan
-
Star Of the monthDikeluarkan oleh PT.CG Power System Indonesia · Jan 2016
-
Terkait dengan CG Power and Industrial Solutions Limited (Formerly Crompton Greaves Limited)
-
-
-
Top 3 best Project Continues Improvement Project (Reduce Lead Time Metal Part Handling)Dikeluarkan oleh PT.CG Power System Indonesia · Jan 2016
-
Terkait dengan CG Power and Industrial Solutions Limited (Formerly Crompton Greaves Limited)
-
-
-
Base on Weekly Scoring & Implementation, my CIT Project (Reduce Frame Assembly Lead time), Nominated as CIT Winner (Forth position)
-
-
-
Top 5 Continues Improvement Project (Reduce Frame Assembly Lead time)Dikeluarkan oleh PT.CG Power System Indonesia · Apr 2015
-
Terkait dengan CG Power and Industrial Solutions Limited (Formerly Crompton Greaves Limited)
-
-
-
Base on Weekly Scoring & Implementation, my CIT Project (Reduce Frame Assembly Lead time), Nominated as Top 5 Project
-
-
Bahasa
-
Bahasa Indonesia
-
English
Minat
-
AkzoNobelAkzoNobel 653.102 pengikut653.102 pengikut
-
-
Korn FerryKorn Ferry 1.215.268 pengikut1.215.268 pengikut
-
-
ALUMNI POLMAN BANDUNG (PMS / PMS-ITB)ALUMNI POLMAN BANDUNG (PMS / PMS-ITB) 1.021 anggota1.021 anggota
-
-
Saigon South International SchoolSaigon South International School 2.650 pengikut2.650 pengikut
-
-
Politeknik Manufaktur Negeri Bandung (PMS-ITB)Politeknik Manufaktur Negeri Bandung (PMS-ITB) 3.804 pengikut3.804 pengikut
-
Tags:
Design Engineer
Industrial Engineer
Project Manager
PT.CG Power Systems Indonesia
Purnawaktu 7 thn 10 bln
Radityo
Sarana Wira Reksa
Star of the month award
Talogo
Tool Designer